-- card: 22008 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 3633 -- name: Time Now Line -- part 28 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=56 right=71 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 29 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=241 top=56 right=71 bottom=463 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 33 (button) -- low flags: 00 -- high flags: A003 -- rect: left=248 top=215 right=236 bottom=444 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Timeline Scale Dialog Box ----- HyperTalk script ----- on mouseUp go card id 91869 end mouseUp -- part 34 (button) -- low flags: 00 -- high flags: A003 -- rect: left=17 top=216 right=237 bottom=214 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Time Now Line Dialog Box ----- HyperTalk script ----- on mouseUp go card id 28789 end mouseUp -- part contents for background part 6 ----- text ----- Lets you specify a date for the Time Now Line in the Task Timeline, Resource Timeline, and Resource Histogram. The line is displayed at the current date unless you change it with this command. The Time Now Line appears as a bold vertical line in the chart. If you don’t want the line to appear, simply specify a date that is outside the time span of your project. -- part contents for background part 7 ----- text ----- Lets you change the time intervals used in the Task Timeline, Resource Timeline, Cash Flow Table, and Resource Histogram. This command does not affect the duration scale. You can also set a start date for the time intervals with this command. If you do not set a date, MacProject II uses the first working day of the project calendar. -- part contents for card part 28 ----- text ----- Time Now Line... -- part contents for card part 29 ----- text ----- Timeline Scale... -- part contents for background part 28 ----- text ----- Time Now Line & Timeline Scale -- part contents for background part 27 ----- text ----- The Layout Menu